Horizontal Tail  *

MM-DD-YYYY

Hours

Photos

Scope of work

03-31-2004

 

 

Horizontal stabilizer and elevator parts laid out except the skins.

04-01-2004

7.0

 

 

 

 

Positioned, drilled and clecoed upper and lower doublers to stabilizer front spar

 

Positioned, drilled and clecoed the rear ribs and nose rib to the forward spar

 

Shaped, positioned, drilled and clecoed both front attach brackets

 

Positioned, drilled and clecoed upper and lower doublers to stabilizer rear spar

 

Positioned, drilled, and clecoed ribs to the rear spar

 

Positioned, drilled, and clecoed the tip ribs to the rear spar

04-02-2004

3.5

 

Shaped and pre-drilled aft bracket

 

Positioned and drilled aft bracket

 

Drilled all holes to proper size in stabilizer skeleton

 

Disassembled stabilizer skeleton, deburred all holes and smoothed all edges

 

Removed all tags and cleaned components for application of corrosion inhibitor

 

04-03-2004

8.0

 

 

 

 

 

 

 

Applied Cortec VCI-373 Wash Primer/Corrosion Inhibitor to all mating surfaces of the stabilizer skeleton

 

Assembled the stabilizer skeleton and riveted

 

Marked rivet lines on bottom of stabilizer skin

 

Drilled and clecoed bottom skin to skeleton

 

Marked cutout for aft bracket

 

Disassembled, debured holes in skeleton and inside of skin

 

Clecoed bottom skin in place

 

Deburred all holes and riveted bottom skin to skeleton

 

 

04-04-2004

3.0

 

Marked all rivet lines on top stabilizer skin

 

Marked area for cut-out for front brackets

 

Wrapped top skin down, drilled and clecoed skin in position

 

04-05-2004

4.0

 

 

Finished drilling the top skin and brought all holes up to proper size

 

Cutout area for front brackets

 

Marked and cut-out area for elevator cable

 

Clecoed front and rear brackets in place

 

Clecoed top skin in position

 

04-06-2004

4.0

 

 

Laid out all parts to the elevator

 

Marked and predrilled elevator spar for aft ribs

 

Marked and installed aft ribs to spar

 

Marked and installed the right nose rib

 

Made rear rib angles, drilled and installed to spar tips

 

Marked, drilled and installed the elevator channel

 

 

04-07-2004

3.0

 

Shaped and drilled both upper rudder hinge angles

 

Drilled and shaped both outboard hinge plates

 

Made 10mm long and 8mm long bushings for the rudder hinges

 

04-08-2004

2.0

 

Predrilled center hinge gusset

 

Made necessary L-angles

 

Made elevator horns drilling jig

 

Made 2.5mm center hinge bushing

 

04-09-2004

1.5

 

Predrilled elevator center hinge and gusset, clecoed in place

 

05-03-2004

6.0

 

Drilled and installed elevator skin to #40 clecoes

 

Marked area for cutout on top of skin

05-04-2004

3.0

 

Drilled all holes in skin up to size

 

Drilled trailing edge for solid rivets.

05-05-2004

6.0

 

 

 

Marked area for cutout on bottom of skin

 

Cutout areas on top and bottom of skins

 

Aligned and drilled elevator center hinge angle

 

Aligned and drilled upper and lower control horns

 

Marked leading edge to enlarge cutout to clear aft side of stabilizer

 

05-06-2004

3.0

 

 

 

Enlarged cutout in leading edge of elevator to 85 mm to clear aft side of stabilizer

 

Located, drilled and clecoed elevator outboard hinge pins

 

Located the proper position, marked, drilled and clecoed the outboard hinge plates to the stabilizer

 

05-26-2004

3.0

 

Made new elevator center hinge angle

 

Aligned and drilled elevator center hinge angle

 

Made new outboard hinge plates

 

Located the proper position, marked, drilled and clecoed the outboard hinge plates to the stabilizer

 

Trimmed 3mm from the trailing edge of the top stabilizer skin for elevator clearance

 

05-31-2004

3.5

 

Drilled all holes to size on stabilizer and elevator

 

Disassembled and deburred all holes in stabilizer and elevator

 

Applied Cortec VCI-373 Wash Primer/Corrosion Inhibitor to all mating surfaces of the elevator skeleton and inside of elevator skin

 

 

06-01-2004

2.0

 

Cleaned aluminum elevator control parts with E-2310 Aluma-Dyne Phosphoic Acid Etch

 

Applied E-2300 Aluma-Dyne Conversion Coating to elevator control parts

 

Assembled and riveted elevator skeleton

 

Assembled elevator and riveted skin on lower side

 

06-02-2004

3.5

 

 

Primed elevator control parts with Zinc Oxide

 

Sprayed inside of elevator and stabilizer with Cortec VCI-373 Wash Primer/Corrosion Inhibitor

 

Clecoed top skins down on elevator and stabilizer

 

Installed rivets in top skins of elevator and stabilizer

 

Installed elevator control parts on elevator

12-12-2004

5.0

 

Marked, drilled and installed the elevator trim tab

 

Marked and cut the access hole for the electric trim servo

 

Drilled the mounting holes for the trim servo

 

Cut the trim servo push-pull tube to the proper length

 

Attached a DB9 connector to the end of the servo wires and made a pip-tail harness to go thru the elevator nose rib and connect to the fuselage wiring

 

Shaped and drilled the access hole cover plate and the elevator skin for later riveting

 

Squeezed all the rivets in the elevator trailing edge

 

Total Time:

71.0

 

Horizontal surfaces complete until final mating with the horizontal stabilizer

 