MM-DD-YYYY |
Hours |
Photos |
Scope of work |
|
09-30-2004 |
4.0 |

|
Confirmed dimensions
of predrilled bottom skin
Laid out centerline
on bottom skin
Trimmed and smoothed
edges of rear bottom skin
Rough cut the access
hole in bottom skin
|
|
10-01-2004 |
4.0 |
|
Finish trimmed the
access hole in bottom skin
Cut and drilled the
two lateral L angles and Z angle to bottom skin
Began layout for a
rear fuselage access panel
|
|
10-02-2004 |
7.0 |

|
Finished layout of
rear access panel
Cutout, drilled and
installed hinged access panel in bottom skin
Laid out, cut,
drilled and installed supplemental L angles between the lateral L angles
on bottom skin
|
|
11-03-2004 |
8.0 |

|
Installed forward and
aft rear fuselage longerons on left and right sides of bottom skin
Installed Rear Torque
Tube Bearing to Bottom Channel
Installed Bottom
Channel to bottom skin
Installed Z angle to
left and right side of fuselage access hole
Installed Short L
angles on both sides of fuselage access hole
Drilled all holes up
to #30
|
|
11-04-2004 |
2.5 |
|
Laid out hole pattern
for nutplates on access cover and fuselage bottom skin
Laid out hole pattern
for nutplates on rear access panel
Drilled alignment
holes for both panels to #30
|
|
10-05-2004 |
8.5 |

|
Drilled and installed
sixteen 8-32 nutplates around access hole
Drilled and installed
five 8-32 nutplates around rear access panel
Trimmed left and
right side skins to size
Clecoed side skins
together and filed all edges to the same size
Aligned, drilled, cut
and clecoed L angles to left side skin
Aligned, drilled, cut
and clecoed additional L angles to left side skin to make X’s and one
diagonal brace
|
|
10-06-2004 |
10.5 |





|
Aligned, drilled and
clecoed upper longerons on left side skin
Aligned, drilled and
clecoed lower longerons on left skin
Drilled all holes in
left skin up to #30
Aligned, drilled, cut
and clecoed L angles to ight side skin
Aligned, drilled, cut
and clecoed additional L angles to right side skin to make X’s and one
diagonal brace
Aligned, drilled and
clecoed upper longerons on ight side skin
Aligned, drilled and
clecoed lower longerons on right skin
Drilled all holes in
right skin up to #30
Disassembled and
debureed the bottom skin, L angles and Z angles
Drilled necessary
holes in Rear Torque Tube Bearing and Bottom Channel up to #20
Disassembled Rear
Torque Tube Bearing and Bottom Channel and deburred all holes
Applied
Cortec VCI-373 Wash Primer/Corrosion
Inhibitor to all mating surfaces of the bottom skin and angles
Assembled bottom skin
to L and Z angles and Rear Torque Tube Bearing and Bottom Channel
Riveted L and Z
angles and Rear Torque Tube Bearing and Bottom Channel to bottom skin
|
|
10-07-2004 |
7.0 |



|
Disassembled right
skin and deburred all holes
Applied
Cortec VCI-373 Wash Primer/Corrosion
Inhibitor to all mating surfaces of the right skin and angles
Assembled right skin
to L angles
Riveted L angles to
right skin
Disassembled left
skin and deburred all holes
Applied
Cortec VCI-373 Wash Primer/Corrosion
Inhibitor to all mating surfaces of the left skin and angles
Assembled left skin
to L angles
Riveted L angles to
left skin
Deburred left and
right lower longerons
Applied
Cortec VCI-373 Wash Primer/Corrosion
Inhibitor to all mating surfaces of the
left and right lower longerons |
|
10-08-2004 |
5.0 |


|
Trimmed top skin to
size
Filed all edges of
the top skin
Aligned, drilled, cut
and clecoed L angles to the top skin
Aligned, drilled, cut
and clecoed additional L angles to the top side skin to make X’s
Laid out 112mm hole
in rear of top skin and cutout
Trimmed rear top skin
stiffener
Laid out rivet
pattern around rear top stiffener and drilled to #40 |
|
10-09-2004 |
6.0 |






|
Drilled all holes in
top skin and L angles to #30
Disassembled top skin
and deburred all holes
Applied
Cortec VCI-373 Wash Primer/Corrosion
Inhibitor to all mating surfaces of the top skin and angles
Assembled top skin to
L angles
Riveted L angles to
top skin
Riveted additional L
angles to the top side skin to make X’s
Cut rudder cables
pass thru holes in left and right skins
Trimmed rear
bulkheads to fit side skins
Fit left skin to
bottom skin
Fit right skin to
bottom skin |
|
10-10-2004 |
6.0 |


|
Drilled HT bulkheads
to side skins
Cut, drilled and
installed L angles on top edged of HT bulkheads
Cut and fit rear
diagonal L angles
Fit top skin to the
side skins
Drilled HT bulkheads
to top skin
Cut and trimmed rear
longerons
Drilled all holes to
proper size
Disassembled rear
fuselage, deburred remaining holes, applied
Cortec VCI-373 Wash Primer/Corrosion
Inhibitor to all mating surfaces of the top skin, bottom skin and side
skins
Assembled and riveted
the bottom skin to the lower longerons
Assembled and riveted
the top skin to the upper longerons
Riveted rear top
stiffener to top skin
Riveted L angles on
top edge of HT bulkheads
|
|
10-11-2004 |
4.5 |


|
Assembled rear
fuselage with clecos
Riveted lower right
and left longerons to side skin
Riveted both HT
bulkheads to bottom skin
Riveted upper right
and left longerons to side skin
Riveted sides of HT
bulkheads to the side skins
Trimmed, drilled and
clecoed both rudder cable outlets and rudder cable fairlead to sides of
rear fuselage
|
|
10-20-2004 |
7.5 |






|
Aligned, drilled and
clecoed 10 gussets at corners of L angle verticals and L angle horizontals
Cutout area from 2
gussets for rudder cable clearance
Removed gussets,
deburred L angles and gussets and applied
Cortec VCI-373 Wash Primer/Corrosion
Inhibitor to all mating surfaces of the gussets
Installed 10 gussets
and riveted in place
Aligned, drilled and
clecoed uprights to predrilled holes
Predrilled baggage
compartment back panel and clecoed to horizontal and vertical L angles
Installed L angles
for sides of extended baggage panel
Installed zee channel
between uprights
Cut extended baggage
panel to size, predrilled holes on 3 sides and clecoed in place
Marked bottom of
extended baggage panel for 2 L angles supports
Cut and marked two L
angles supports for the extended baggage panel lower side
Trimmed the bottom
longerons to match the side and bottom skins |
|
10-21-2004 |
6.0 |

|
Cut, aligned and
drilled both side channels and clecoed in place
Positioned, drilled
and clecoed both top longeron gussets to top skin
Cut shoulder harness
attachment to size, drilled and clecoed both attachments to side skins
Filed slot in tapered
channel, positioned, drilled and clecoed channel to the side skins
Cut the rear wing
attachment brackets to size and predrilled the holes
Checked the distance
between the two wing attachment bolt holes and drilled the brackets and
attached to the side channels with cleos
Cut the top channel
to proper angle and size
Clamped the top
channel behind the rear wing attachments, drilled and clecoed
Drilled and clecoed
the rivet line on the top skin through the top channel
Cut, positioned,
drilled and clecoed the uprights to the fuselage side skins
|
|
10-22-2004 |
6.5 |




|
Trimmed upright
doublers
Positioned, drilled
and clecoed upright doublers to the side channels and uprights
Laid out and cut the
baggage floor
Cut and installed L
angle inside of front flange on the baggage floor
Predrilled holes on
sides of baggage floor
Positioned baggage
floor, drilled and clecoed
Cut the seat back to
size
Positioned, drilled
and clecoed the seat back in place
|
|
10-23-2004 |
9.5 |





|
Cut, aligned, drilled
and clecoed both aileron control rod covers in baggage compartment
Cut, drilled and
clecoed all L angles for the aileron control rod covers
Cut, drilled and
clecoed L angle supports under extended baggage floor
Drilled all holes in
baggage compartment up to #30
Fabricated antennae
reinforcement plate, installed #6 nutplates for attachment, drilled all
holes to size including BNC connector access hole
Disassembled baggage
compartment
|
|
10-24-2004 |
8.0 |

|
Installed wires for
the elevator trim and tail light in rear fuselage and secured to L angle
verticals on the right side of the fuselage
Drilled necessary
holes up to #20 in baggage compartment
Deburred all holes in
baggage compartment and applied
Cortec VCI-373 Wash Primer/Corrosion Inhibitor to all mating surfaces of
the baggage compartment
Assembled the baggage
compartment and riveted the extended baggae compartment area
|
|
11-28-2004 |
1.0 |
|
Installed both L
angles at the ends of the bottom channel
|
|
1-8-2005 |
1.5 |
|
Drilled the rest of
the holes thru the top angles of the aileron control tube covers and thru
the fuselage top skin
Deburred all holes
applied Cortec VCI-373 Wash
Primer/Corrosion Inhibitor to all mating surfaces of
the aileron control tube covers
|
|
Total Time: |
113.0 |
|
|