|
Trimmed front of
torque tube and fit in the fuselage
Squared the torque
tube with the bottom channel and installed the two L angles to fix ithe
bottom channel location
Aligned the horn with
the torque tube and marked for drilling
Fit the elevator
bellcrank on the torque tube
Drilled the torque
tube for the horn
Drilled the front
hole in the elevator control tube
Assembled the control
stick and elevator control tube to the torque tube
Drilled the ¾” holes
in the flaperon control bearings and predrilled the rivet pattern
Back drilled the
bearing to the L angles on the back of the seat and the bottom of the
baggage floor
Drilled the holes for
the cotter pins that hold the flaperon bellcrank assemblies on the
flaperon control
Drilled the hole in
the bottom of the flaperon control to attach to the flaperon control lever
Fit the flaperon bell
crank assemblies in the fuselage
Marked and drilled
the flaperon control lever for the bolt that attaches to the control mount
and trimmed the flaperon control lever to length
Cut the lower control
rods to length and assembled with rod end bearings
Fit lower control
rods between the horn and flaperon bellcranks
|